Emergency lighting

A statutory duty met without your effort

Operating emergency lighting requires regular testing and keeping an operating logbook. In practice this is done badly or not at all — because it means sending someone around the building, manually cutting the supply and writing down the result. We do it remotely and the record writes itself.

What the standard requires

Emergency lighting in the Czech Republic is governed by ČSN EN 50172 and related regulations (ČSN 33 2000-7-718). In short, three obligations:

Monthly functional test

Verification that the luminaires come on during a mains failure and the system works.

Annual full-duration test

Verification that the backup lasts the full required time — in our case a target of 60 minutes.

Operating logbook

A chronological record of tests, faults and their rectification. For a facility manager it is the document that gets looked for first in a dispute.

The precise scope of obligations depends on the building type and the project design. We are happy to go through it with your inspection engineer.

How we test remotely

Emergency luminaires are usually non-maintained — they only come on when the mains fails. Simply switching the output on will not light them, so the module genuinely disconnects the input to the UPS and simulates the outage. This is also the testing method the standard envisages.

  1. 1 The server sends the module a command to start the test.
  2. 2 The module disconnects the input. The luminaires come on, the UPS runs from battery.
  3. 3 The module transmits measured values at minute 0, 1, 5, 10, 15 and 20.
  4. 4 The server fits a discharge curve through those points and extrapolates whether the set will meet the target duration.
  5. 5 After the test the charging current is observed — a longer recharge means a weaker battery.
  6. 6 A protocol and a logbook entry are produced.
Battery set discharge curve

Illustrative. A set of six 12V blocks, protective threshold 66 V.

66 V — threshold 0 1 5 10 15 20 minutes from the start of the test
Passed Failed — set due for replacement

Safeguards so the test does no harm

While the test runs, the backup is being consumed. It is therefore hedged with conditions:

  • If the set voltage drops below the protective threshold, the module immediately restores the input and the test is recorded as failed.
  • A test cannot be started on a low battery or while another alarm is active.
  • A test can be aborted at any time, remotely or locally.
  • The customer defines time windows in which testing is not permitted.
  • If communication is lost, the input is restored automatically.

Protective threshold

We work exclusively with 12V gel batteries. A UPS shuts itself down at 10.5 V per block; the test threshold is set higher, at 11 V per block. For a set of six blocks that means 66 V.

10.5 V

UPS shutdown

11.0 V

test threshold

66.0 V

6 blocks × 11 V

The number of blocks is configured per UPS. All thresholds refer to a 12V block, not to a 2V cell.

Short and full tests

Monthly — short

From the curve over the first 15 to 20 minutes we extrapolate whether the set will deliver the full hour. This spares both the battery and time, and satisfies the monthly obligation.

Annual — full

Actual verification of the whole target duration. It is scheduled in advance and staff can postpone it — while it runs the backup is depleted, which in some operations needs to be agreed.

Electronic operating logbook

Every test, fault, repair and replacement is recorded in the logbook kept for that building. Entries cannot be deleted or overwritten — only a corrective entry can be added. That is precisely what gives the record its evidential value.

  • Chronological record per building
  • Protocols downloadable as PDF
  • Archive of inspections and call-out protocols in one place
  • Available in the customer portal

The customer portal with the logbook and archive is in preparation. Until it launches we send protocols by email.

Operating logbook — Hall D3

  1. 24 Jul 2026

    Monthly functional test — PASSED

    Extrapolated runtime 68 min. Protocol 2026/07-D3.

  2. 24 Jun 2026

    Monthly functional test — PASSED

    Extrapolated runtime 71 min. Protocol 2026/06-D3.

  3. 02 Jun 2026

    Battery set replacement

    Switchboard R5, 6 × 12V/26Ah. Old set sent for disposal.

  4. 28 May 2026

    Annual full-duration test — FAILED

    Voltage reached the threshold at minute 34. Set recommended for replacement.

Interface example, illustrative values.

It starts with a UPS audit of the estate

We survey the whole site — including backed-up systems nobody currently keeps records of. The output is an inventory of the equipment, its condition and a proposal for what is worth monitoring. Only then does a quotation follow.