Monthly functional test
Verification that the luminaires come on during a mains failure and the system works.
Operating emergency lighting requires regular testing and keeping an operating logbook. In practice this is done badly or not at all — because it means sending someone around the building, manually cutting the supply and writing down the result. We do it remotely and the record writes itself.
Emergency lighting in the Czech Republic is governed by ČSN EN 50172 and related regulations (ČSN 33 2000-7-718). In short, three obligations:
Verification that the luminaires come on during a mains failure and the system works.
Verification that the backup lasts the full required time — in our case a target of 60 minutes.
A chronological record of tests, faults and their rectification. For a facility manager it is the document that gets looked for first in a dispute.
The precise scope of obligations depends on the building type and the project design. We are happy to go through it with your inspection engineer.
Emergency luminaires are usually non-maintained — they only come on when the mains fails. Simply switching the output on will not light them, so the module genuinely disconnects the input to the UPS and simulates the outage. This is also the testing method the standard envisages.
Illustrative. A set of six 12V blocks, protective threshold 66 V.
While the test runs, the backup is being consumed. It is therefore hedged with conditions:
We work exclusively with 12V gel batteries. A UPS shuts itself down at 10.5 V per block; the test threshold is set higher, at 11 V per block. For a set of six blocks that means 66 V.
10.5 V
UPS shutdown
11.0 V
test threshold
66.0 V
6 blocks × 11 V
The number of blocks is configured per UPS. All thresholds refer to a 12V block, not to a 2V cell.
From the curve over the first 15 to 20 minutes we extrapolate whether the set will deliver the full hour. This spares both the battery and time, and satisfies the monthly obligation.
Actual verification of the whole target duration. It is scheduled in advance and staff can postpone it — while it runs the backup is depleted, which in some operations needs to be agreed.
Every test, fault, repair and replacement is recorded in the logbook kept for that building. Entries cannot be deleted or overwritten — only a corrective entry can be added. That is precisely what gives the record its evidential value.
The customer portal with the logbook and archive is in preparation. Until it launches we send protocols by email.
24 Jul 2026
Monthly functional test — PASSED
Extrapolated runtime 68 min. Protocol 2026/07-D3.
24 Jun 2026
Monthly functional test — PASSED
Extrapolated runtime 71 min. Protocol 2026/06-D3.
02 Jun 2026
Battery set replacement
Switchboard R5, 6 × 12V/26Ah. Old set sent for disposal.
28 May 2026
Annual full-duration test — FAILED
Voltage reached the threshold at minute 34. Set recommended for replacement.
Interface example, illustrative values.
We survey the whole site — including backed-up systems nobody currently keeps records of. The output is an inventory of the equipment, its condition and a proposal for what is worth monitoring. Only then does a quotation follow.
or call +420 250 250 220