Remote UPS monitoring

UPS under constant supervision.

We turn dumb UPS units into smart ones.

Most backup power units in warehouses and industrial estates have no communication card — nobody knows whether they are running, what condition the batteries are in, or whether the backup would last through an actual outage. UPS Smart Monitor determines this externally, regardless of the manufacturer or the age of the unit.

Why an annual inspection is not enough

Between two inspections lies a year of silence. Plenty can go wrong in that time — and all of it surfaces at the exact moment the backup matters.

01

Nobody is watching

A UPS can sit switched off, overloaded or faulty for months without anyone noticing. It comes to light at the next inspection — or during an outage.

02

Batteries fail quietly

Gel batteries degrade gradually, driven mainly by temperature. A single deep discharge can halve the life of a battery set without leaving any visible trace on the equipment.

03

During an outage it is too late

Without testing, a failed backup reveals itself only when it is needed. With emergency lighting that is a safety problem, not merely an operational one.

How it works

Four steps from installation to protocol. No interference with your IT network and no replacement of the existing UPS.

  1. 1

    A module in the switchboard

    UPS Smart Monitor is fitted in series between the mains and the UPS. DIN rail, up to six modules wide. It measures voltage, current and active power on both the input and the output, plus battery set voltage and temperatures.

  2. 2

    Reports over GSM

    Data is sent by SMS, or over a data connection where one is available. No changes to the customer network, no ports to open, no sign-off from the IT department.

  3. 3

    The server evaluates the trend

    Repeated tests build a discharge curve, and from it a battery health index with an estimate of remaining life. The model runs on the server, so field devices need no firmware updates for it.

  4. 4

    Protocol and logbook

    Test results feed automatically into a protocol and into the electronic operating logbook. An alarm arrives before a deteriorating condition turns into a failure.

Reactive versus predictive maintenance

Reactive model (today) Predictive model
Service once a year, silence in between Continuous supervision
Battery condition known only at inspection Degradation trend months in advance
Deep discharge destroys the set Alarm before discharge occurs
UPS off for months, nobody knows Immediate "UPS not operating" alert
An outage exposes the failed backup Monthly verification that the backup works
Unplanned spend in the tens of thousands Planned, budgeted maintenance
Emergency lighting tested manually, or not at all Automated test and protocol

What gets measured

Target runtime verified by the test
60 min
Protective threshold per 12V block, at which the test aborts
11 V
Discharge curve sampling: minute 0, 1, 5, 10, 15 and 20
6 points
Functional test per ČSN EN 50172
1× month
For estate managers

Logistics and industrial parks

Dozens of UPS units across multiple halls, each a different age and a different supplier. Monitoring brings them into a single overview, evidences compliance with mandatory testing, and supplies data for BREEAM — consumption sub-metering, a documented maintenance regime and extended battery set life.

Specific credits vary by scheme and version, so we do not quote them. We are happy to walk through it with your BREEAM assessor.

What this means for your park

Hall D3 — switchboard R2

Passed
Battery set voltage
72.4 V
Protective threshold (6 blocks)
66.0 V
Circuit load
358 W
Reference draw
360 W
Battery box temperature
24.1 °C
Inspection expires in 41 days 1 device without data

Interface example, illustrative values.

It starts with a UPS audit of the estate

We survey the whole site — including backed-up systems nobody currently keeps records of. The output is an inventory of the equipment, its condition and a proposal for what is worth monitoring. Only then does a quotation follow.