References

What a battery that need not have died costs

The best argument for monitoring is not technical but financial. Below is a model calculation built on figures from our own practice — and beneath it, the situations we most often deal with on site.

Model example

What one deep discharge costs

Take one ordinary emergency lighting system. The figures below come from our practice; the price of a battery set varies by type and capacity, so we leave it as a variable.

Inputs

Battery set

18 units

12V gel batteries per system

Labour to replace a set

~CZK 3,000

excluding materials

Margin on materials

20–30 %

usual range

Reduction in service life

up to 1/2

consequence of a single deep discharge

How it works out

  1. 1 A battery set treated correctly serves its full life and is replaced once.
  2. 2 A set that is deeply discharged once serves roughly half that time. Over the same period you therefore replace it twice.
  3. 3 Battery costs over the period double — and a second CZK 3,000 labour charge and a second call-out are added on top.
  4. 4 The monthly monitoring fee is a fraction of one such premature replacement. Payback therefore arrives with the very first system saved.
Replacements over the same period
Set with no deep discharge 1×
Set after a deep discharge 2×

A simplified illustration. Twice the replacements means twice the material cost plus a second labour charge.

This is a model calculation, not a quotation. Actual payback depends on the number of systems, the price of your battery sets and how many of them are currently at risk. That is precisely what the audit establishes.

What we deal with on site

Anonymised situations from UPS service practice. We do not name individual customers — naming a client without their written consent is not something we consider proper.

The situations below are currently a structural draft, not descriptions of specific jobs. They will be replaced with real cases before the site launches.

Logistics park

Central Bohemia · 12 UPS · emergency lighting

Three of twelve UPS units had been off for months

The initial audit revealed that some backup units had been left switched off after a previous inspection. Nobody noticed, because nobody had looked at them for a year. Two battery sets could no longer be revived.

Monitoring now reports a switched-off UPS the same day.

Production hall

Prague West · 6 UPS · emergency lighting and gates

Emergency lighting tests were not being done at all

An operating logbook existed, but the last entry was several years old. The site manager knew about the obligation; there was simply nobody to walk the building and trip the breakers.

Monthly tests now run remotely and the record writes itself.

Shopping centre

Pilsen region · 4 UPS · emergency lighting

The battery box stood next to the air handling unit

The set in one switchboard was degrading markedly faster than the others. A temperature sensor showed the box ran about ten degrees warmer than elsewhere — and gel batteries are temperature sensitive.

After relocating the box, set life came into line with the rest of the building.

Find out how much of this you have

A site audit shows how many systems you have, what condition they are in and how many are currently at risk. Only then can it be calculated whether monitoring pays off for you.