The situations below are currently a structural draft, not descriptions of specific jobs. They will be replaced with real cases before the site launches.
Logistics park
Central Bohemia · 12 UPS · emergency lighting
Three of twelve UPS units had been off for months
The initial audit revealed that some backup units had been left switched off after a previous inspection. Nobody noticed, because nobody had looked at them for a year. Two battery sets could no longer be revived.
Monitoring now reports a switched-off UPS the same day.
Production hall
Prague West · 6 UPS · emergency lighting and gates
Emergency lighting tests were not being done at all
An operating logbook existed, but the last entry was several years old. The site manager knew about the obligation; there was simply nobody to walk the building and trip the breakers.
Monthly tests now run remotely and the record writes itself.
Shopping centre
Pilsen region · 4 UPS · emergency lighting
The battery box stood next to the air handling unit
The set in one switchboard was degrading markedly faster than the others. A temperature sensor showed the box ran about ten degrees warmer than elsewhere — and gel batteries are temperature sensitive.
After relocating the box, set life came into line with the rest of the building.