A fault must not put the lights out
The switching element is closed at rest. On loss of power or a logic fault the circuit stays energised — the module removes itself from the path rather than breaking it.
An interposer fitted between the mains and your existing UPS. It measures what happens on both sides, can simulate a mains failure for testing purposes and reports over GSM. It turns a simple backup unit into one you actually know about.
The module sits in series. On the input it measures what the UPS draws from the mains; on the output, what the UPS delivers to the backed-up circuit. Plus battery set voltage and temperatures.
Mains
input
UPS Smart Monitor
measuring + switching
UPS
existing unit
Backed-up circuit
e.g. emergency lighting
The device is designed to fit an ordinary switchboard without rebuilding it, and so that a fault in the module can never disconnect the backed-up circuit.
| Mounting | DIN rail, up to 6 modules wide |
|---|---|
| Ingress protection | min. IP20 inside the switchboard |
| Current measurement | without breaking the conductor where possible |
| Indication | status LEDs for the technician |
| Service interface | local USB or BLE, works without internet |
| Firmware updates | remote, dual bank with rollback |
| Identification | unique device ID paired with the SIM |
| Own power supply | battery or supercapacitor, survives a mains failure |
In active mode the module is fitted in series with the emergency lighting circuit — an element on which the safety of people depends. Several things follow from that, none of them optional.
The switching element is closed at rest. On loss of power or a logic fault the circuit stays energised — the module removes itself from the path rather than breaking it.
If the link to the server drops during a test, the module restores the input by itself. It never remains in the disconnected state.
The device must undergo conformity assessment and be designed by a qualified electrical engineer. Compliance with requirements for emergency lighting circuits is assessed together with an inspection engineer.
The device is under development. Before it goes into service at customer sites it will undergo conformity assessment and verification by an inspection engineer.
Warehouses tend to have weak signal and unstable data. SMS is therefore the primary channel — it gets through where a data connection drops.
A regular heartbeat carrying measured values, an immediate message on alarm and on test results, and commands towards the module.
Where LTE, NB-IoT or LAN is available, full telemetry runs at higher resolution over it. SMS remains as fallback.
Reporting frequency is configured per device and changed remotely — more often where it matters.
UPS Smart Monitor is not sold separately. We supply it as part of the monitoring service — including installation, commissioning and calibration against your particular circuit. Without calibration the measured values would have no reference point to compare against.
We survey the whole site — including backed-up systems nobody currently keeps records of. The output is an inventory of the equipment, its condition and a proposal for what is worth monitoring. Only then does a quotation follow.
or call +420 250 250 220