For estate managers

Dozens of UPS units across halls. One overview.

A large estate holds more backed-up systems than anyone keeps records of. Different ages, different suppliers, different conditions — with only one thing in common: nobody knows anything about them until something fails. Monitoring brings them into a single list with a status indicator.

What makes a large estate different

Approaches that work for a single UPS in a server room do not transfer to an estate. Four things need solving that do not arise elsewhere.

01

Nobody knows what is actually there

Besides emergency lighting, an estate usually has other backed-up systems — typically UPS units powering smoke-extraction gate operation. Most are in no register at all. An audit finds and classifies them.

02

Access is half the job

A call-out requires knowing where the keys are, who the site manager is and when the estate is open. We record this for every building, because without it the technician simply stands at the gate.

03

Reporting goes upwards

A facility manager needs to evidence the state of the portfolio to the owner or the assessor, not forward individual protocols. Monthly and quarterly summaries arrive as PDF automatically.

04

Compliance sits on your desk

Emergency lighting tests and the operating logbook are a statutory duty that few actually fulfil. Here the record is generated automatically from every test.

The portfolio on one screen

The customer portal shows every building with a status indicator, consumption over time, the protocol archive and the operating logbook. Portfolio managers see all estates; a building manager sees only their own.

The customer portal is in development. Until it launches we send reports and protocols by email — the content is the same, only the route is longer.

Overview example

Building UPS Last test Status
Hall D3 6 24 Jul 2026 Passed
Hall D4 8 24 Jul 2026 Reduced capacity
Hall A1 5 22 Jul 2026 Failed
Gatehouse 1 — No data

Interface example, illustrative values.

BREEAM

Data that helps in certification

Monitoring does not issue a certificate and does not replace an assessor. What it does produce is continuous operational data that several categories call for — and that nobody else is collecting.

Energy

Consumption metering of backed-up circuits

Sub-metering is a credited requirement. We measure actual consumption over time, including passively monitored systems such as gates.

Management

Evidenced maintenance regime and aftercare

Continuous operational supervision with reporting, rather than a single inspection once a year.

Waste / Materials

Longer battery set life

Lead-acid batteries are hazardous waste. A set that is not destroyed by premature deep discharge is replaced less often — a demonstrable benefit.

Health

Working emergency lighting with evidenced tests

Occupant safety backed by records rather than by assertion.

BREEAM In-Use

Continuous operational data

Exactly the kind of evidence required when assessing buildings in operation.

We do not quote specific credit counts — they vary by scheme and version and are assigned by the assessor. We are happy to go through the evidence directly with the BREEAM assessor on your project.

How working together looks

  1. 1

    Site audit

    We survey every backed-up system, including third-party ones. The output is an inventory of equipment and conditions plus a proposal for what to monitor actively and what passively.

  2. 2

    Pilot on one hall

    We deploy monitoring on a limited number of UPS units. Within a few months the actual benefit is visible, before deciding on the whole estate.

  3. 3

    Roll-out

    Gradual coverage of the rest of the portfolio. New buildings are added without rebuilding anything.

  4. 4

    Operation and reporting

    Monthly tests, protocols, alarms and a summary report for your team and for the owner.

Let us walk your team through it

We tailor the presentation to your portfolio — what you most likely have on site, what of it can be monitored and how it fits your certification. It takes about an hour.